| United States Submarine Veterans, Inc. | ||
| Nautilus Base | ||
![]() |
Nautilus Model Project Page 2 Below
Photos
©2006 & 2007 Dan O'Dwyer & Frank Holland
|
|
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
| |
Stern Planes, rudder & prop shroud after
fiberglassing.
Superstructure framing in place. |
|
![]() |
||
|
Left - Forward framing & wire
mesh.
Right - Frank Holland checks out fiberglass on port side forward. |
||
|
||
| |
Left - Starboard forward framing & wire mesh Right - Port forward fiberglassing. | |
| |
![]() |
|
|
Above - Jig Frank made to hold fiberglass under the forward bow
section. |
||
![]() |
||
|
Above - Ken Cole sands the fiberglass prior to application
of finish coat. |
||
![]() |
||
| Left -
Starboard
fiberglass.
Right - Ken Cole working on port side sanding. |
||
![]() |
||
| L -
Frank Holland working on turtle-back
R - Ken
Cole sanding front bow section |
||
![]() |
||
|
||
![]() |
||
| L -
After installation of the sheet
metal
R - Frank Holland & Ken Cole showing bow & Torpedo tubes |
||
![]() |
||
| L -
Frank Holland & Dan O'Dwyer at bow & torpedo tubes
R - Ken Cole
& Dan O'Dwyer take a break |
||
|
Base
Projects
\ Muster List
\ Eternal Patrol
\ Links |